| Asset ID | Tag Number | Equipment Type | Fluid Service | Location | Design P (bar) | Design T (°C) | Material | Status |
|---|---|---|---|---|---|---|---|---|
| AST-001 | TK-101A | Storage Tank | Crude Oil | Tank Farm A | 10.3 | 60 | A516 Gr.70 | Active |
| AST-002 | PV-201 | Pressure Vessel | Natural Gas | Processing Unit 2 | 85.0 | 150 | SA-516 Gr.70 | Active |
| AST-003 | PL-12A | Pipeline | Condensate | Header Line | 40.0 | 95 | API 5L X65 | Under Review |
| AST-004 | HX-301 | Heat Exchanger | Process Water | Utilities Block | 12.0 | 80 | SS 316L | Active |
| AST-005 | V-07 | Pressure Vessel | Hydrocarbon Gas | Compression Unit | 120.0 | 200 | SA-387 Gr.11 | Active |
| AST-006 | TK-104C | Storage Tank | Fuel Oil | Tank Farm B | 5.0 | 45 | A36 | Active |
| AST-007 | C-01 | Compressor | Natural Gas | Comp. Station 1 | 150.0 | 120 | Alloy Steel | Decommissioned |
| AST-008 | PV-220 | Pressure Vessel | Amine | Gas Treating Unit | 20.5 | 130 | SA-516 Gr.70 | Under Review |
| Tag | Equipment | PoF Category | CoF Category | Risk Level | Method | Next Inspection | Interval (yr) |
|---|---|---|---|---|---|---|---|
| TK-04 | Storage Tank | High | High | High | Semi-Quantitative | Jan 2025 | 1 |
| V-07 | Pressure Vessel | Medium | High | High | Quantitative | Mar 2025 | 2 |
| PL-12A | Pipeline | Medium | Medium | Medium | Semi-Quantitative | Jun 2025 | 3 |
| PV-201 | Pressure Vessel | Low | Medium | Medium | Qualitative | Sep 2025 | 3 |
| HX-301 | Heat Exchanger | Low | Low | Low | Qualitative | Dec 2026 | 5 |
| TK-101A | Storage Tank | Low | Low | Low | Qualitative | Aug 2026 | 4 |
| Insp. ID | Asset Tag | Equipment | Inspection Type | Method | Scheduled Date | Inspector | Report | Status |
|---|---|---|---|---|---|---|---|---|
| INS-2024-031 | TK-04 | Storage Tank | External Visual | CVI | 15 Jan 2025 | A. Rahman | — | Scheduled |
| INS-2024-030 | V-07 | Pressure Vessel | Thickness Survey | UT | 10 Jan 2025 | B. Santoso | — | In Progress |
| INS-2024-029 | PL-12A | Pipeline | Corrosion Survey | UT/RT | 18 Dec 2024 | C. Wibowo | View PDF | Completed |
| INS-2024-028 | PV-201 | Pressure Vessel | Full Inspection | WFMT/UT | 05 Dec 2024 | A. Rahman | View PDF | Completed |
| INS-2024-027 | HX-301 | Heat Exchanger | Tube Bundle | ECT | 01 Nov 2024 | D. Pratama | View PDF | Completed |
| INS-2024-026 | TK-101A | Storage Tank | Internal Visual | CVI | 25 Sep 2024 | B. Santoso | — | Overdue |
| Anomaly ID | Asset Tag | Description | Classification | Severity | Raised Date | Due Date | Assigned To | Status |
|---|---|---|---|---|---|---|---|---|
| ANO-024-001 | TK-04 | Wall thinning — bottom plate, SE quadrant | Corrosion | Critical | 18 Dec 2024 | 31 Jan 2025 | A. Rahman | Open |
| ANO-024-002 | V-07 | Pitting corrosion on nozzle N3 | Corrosion | High | 10 Dec 2024 | 28 Feb 2025 | B. Santoso | In Progress |
| ANO-024-003 | PL-12A | Surface crack — 12 o'clock position, km 4.2 | Cracking | High | 19 Dec 2024 | 15 Jan 2025 | C. Wibowo | Open |
| ANO-024-004 | PV-201 | Coating degradation — shell zone B | Coating Defect | Medium | 05 Dec 2024 | 30 Mar 2025 | D. Pratama | Pending Review |
| ANO-024-005 | HX-301 | Tube thinning — pass 2, rows 4–6 | Corrosion | Medium | 01 Nov 2024 | 28 Feb 2025 | A. Rahman | In Progress |
| ANO-024-006 | TK-101A | Minor weld discontinuity — roof to shell joint | Weld Defect | Low | 20 Oct 2024 | 30 Jun 2025 | B. Santoso | Closed |
| Assess. ID | Asset Tag | Assessment Type | FFS Level | Anomaly Ref. | Remaining Life | MAWP (bar) | Assessed By | Date | Outcome |
|---|---|---|---|---|---|---|---|---|---|
| ENG-2024-010 | TK-04 | General Metal Loss | Level 2 | ANO-024-001 | 2.1 yr | 9.8 | Ir. Suharto | 20 Dec 2024 | Unacceptable |
| ENG-2024-009 | V-07 | Local Metal Loss | Level 1 | ANO-024-002 | 4.5 yr | 115.0 | Ir. Kurniawan | 15 Dec 2024 | Conditional |
| ENG-2024-008 | PL-12A | Crack-Like Flaw | Level 2 | ANO-024-003 | 1.8 yr | 36.5 | Ir. Suharto | 22 Dec 2024 | Unacceptable |
| ENG-2024-007 | PV-201 | General Metal Loss | Level 1 | — | 8.3 yr | 84.5 | Ir. Kurniawan | 06 Dec 2024 | Acceptable |
| ENG-2024-006 | HX-301 | Local Metal Loss | Level 1 | ANO-024-005 | 6.0 yr | 11.8 | Ir. Suharto | 05 Nov 2024 | Acceptable |